Compliance Engine
47 ACM protocols actively validating every process in real time.
Protocol Library
47 ACM protocols · ACM-01 to ACM-47
- ACM-01PendingSurface Preparation — Alkaline CleaningAMS 2700 · Updated 01/28/2026
- ACM-02ValidatedSurface Preparation — Solvent WipeAMS 3166 · Updated 02/27/2026
- ACM-03ValidatedMechanical Abrasion — Aluminum OxideBoeing D6-54574 · Updated 03/26/2026
- ACM-04ValidatedPhosphoric Acid Anodizing — Bath ControlBAC 5555 · Updated 04/25/2026
- ACM-05ValidatedSulfuric Anodizing — Concentration & VoltageMIL-A-8625 · Updated 05/24/2026
- ACM-06ValidatedHard Chrome Plating — Bath CompositionAMS 2406 · Updated 01/23/2026
- ACM-07ValidatedHard Chrome Plating — Current Density ControlAMS 2406 · Updated 02/22/2026
- ACM-08ValidatedHard Chrome Plating — Stress Relief BakeAMS 2759 · Updated 03/21/2026
- ACM-09ValidatedHard Chrome Plating — Hydrogen EmbrittlementASTM F519 · Updated 04/20/2026
- ACM-10ValidatedMicroporous Chrome — Crack Density InspectionProprietary · Updated 05/19/2026
- ACM-11ValidatedMicroporous Chrome — Deposition ParametersProprietary · Updated 01/18/2026
- ACM-12ValidatedMicroporous Chrome SealingProprietary · Updated 02/17/2026
- ACM-13ValidatedCadmium Plating — Brush ApplicationAMS 2401 · Updated 03/16/2026
- ACM-14PendingCadmium-Titanium Plating ControlAMS 2419 · Updated 04/15/2026
- ACM-15ValidatedZinc-Nickel Alloy PlatingASTM B841 · Updated 05/14/2026
- ACM-16ValidatedElectroless Nickel Plating — Bath pHAMS 2404 · Updated 01/13/2026
- ACM-17ValidatedElectroless Nickel — Phosphorus ContentAMS 2404 · Updated 02/12/2026
- ACM-18ValidatedBright Nickel Plating ControlAMS 2424 · Updated 03/11/2026
- ACM-19ValidatedSilver Plating — Engineering ApplicationsAMS 2410 · Updated 04/10/2026
- ACM-20ValidatedTin-Lead Plating ProcessAMS 2408 · Updated 05/09/2026
- ACM-21ValidatedChemical Conversion Coating — Class 1AMIL-DTL-5541 · Updated 01/08/2026
- ACM-22ValidatedChromate Conversion — Aluminum SubstratesMIL-DTL-5541 · Updated 02/07/2026
- ACM-23ValidatedBoric-Sulfuric Anodizing ProcessBoeing BAC 5632 · Updated 03/06/2026
- ACM-24ValidatedTartaric-Sulfuric Anodizing — AirbusAIPS 02-01-003 · Updated 04/05/2026
- ACM-25ValidatedPhosphate Conversion CoatingMIL-DTL-16232 · Updated 05/04/2026
- ACM-26ValidatedBlack Oxide on Steel ComponentsMIL-DTL-13924 · Updated 01/03/2026
- ACM-27PendingChromic Anodizing — Concentration ControlAMS 2482 · Updated 02/28/2026
- ACM-28ValidatedSulfuric Anodizing — Seal QualityISO 10074 · Updated 03/27/2026
- ACM-29ValidatedAnodic Seal — Hot Water MethodASTM B680 · Updated 04/26/2026
- ACM-30ValidatedAnodic Seal — Nickel AcetateMIL-A-8625 · Updated 05/25/2026
- ACM-31ValidatedPassivation of Stainless SteelAMS 2700 · Updated 01/24/2026
- ACM-32ValidatedPickling of Titanium AlloysAMS 2249 · Updated 02/23/2026
- ACM-33ValidatedCadmium-Free Chromate ConversionProprietary/REACH · Updated 03/22/2026
- ACM-34ValidatedPrimer Application — Epoxy MIL-PRF-23377MIL-PRF-23377 · Updated 04/21/2026
- ACM-35ValidatedPrimer Application — High Solids 23377 Class NMIL-PRF-23377 · Updated 05/20/2026
- ACM-36ValidatedPrimer Application — Strontium-Free AlternativeProprietary · Updated 01/19/2026
- ACM-37ValidatedIntermediate Coat ApplicationMIL-PRF-85285 · Updated 02/18/2026
- ACM-38ValidatedTopcoat Application — Polyurethane TopcoatMIL-PRF-85285 · Updated 03/17/2026
- ACM-39ValidatedTopcoat Application — Flexible PolyurethaneMIL-PRF-85285 · Updated 04/16/2026
- ACM-40PendingTopcoat Application — Spray Pattern QAAC 43-4B · Updated 05/15/2026
- ACM-41ValidatedTopcoat Application — Humidity ControlMIL-PRF-85285 · Updated 01/14/2026
- ACM-42ValidatedDry Film Thickness — Wet-on-Wet MeasurementASTM D7378 · Updated 02/13/2026
- ACM-43ValidatedAdhesion Testing — Cross-HatchASTM D3359 · Updated 03/12/2026
- ACM-44ValidatedCure Verification — MEK Double RubASTM D5402 · Updated 04/11/2026
- ACM-45ValidatedColor & Gloss VerificationASTM D523 · Updated 05/10/2026
- ACM-46ValidatedFinal Inspection — Visual & TactileAC 43-4B · Updated 01/09/2026
- ACM-47ValidatedCompliance Documentation — FAA 8130-3 Package14 CFR Part 43 · Updated 02/08/2026
Active Bay Validation
Real-time parameter monitoring · Testo 625 IoT sensors
Bay 1 — Hard Chrome
- Concentration245 g/L ✓spec: 230–260 g/L
- Temperature34.8°C ✓spec: 35°C ±1°C
- Current Density22 A/dm² ✓spec: 18–26 A/dm²
Bay 3 — Primer Application
- Humidity63% RH ⚠spec: max 60% RH
- Temperature24°C ✓spec: 18–30°C
- DFT Reading0.8 mil ✓spec: 0.6–1.2 mil
Bay 2 — Anodizing
- Bath Concentration48 g/L ✓spec: 40–55 g/L
- Temperature32°C ✓spec: 30–35°C
- Voltage18 V ✓spec: 15–22 V
Standards Coverage Matrix
All 47 protocols mapped to applicable standards
| Standard | Protocols | Coverage |
|---|---|---|
| 14 CFR Part 43 | 12 protocols | 100% mapped |
| AC 43-4B | 8 protocols | 100% mapped |
| AMS 2482 (Chromic Anodizing) | 3 protocols | 100% mapped |
| AMS 2406 (Hard Chrome) | 4 protocols | 100% mapped |
| AMS 2700 (Surface Cleaning) | 2 protocols | 100% mapped |
| Boeing D6-54574 | 5 protocols | 100% mapped |
| MIL-PRF-23377 (Primer) | 3 protocols | 100% mapped |
| EASA Part 145 | 47 protocols | 100% mapped |
Audit Findings Trend
Last 6 quarters · downward trajectory